27
BA082201-en
9
Maintenance
DANGER
Risk of death or severe personal injury by electric shock
Before doing any maintenance work, turn off the main switch and protect it
against tampering.
9.1
Maintenance Schedule
Interval
Maintenance points
Procedure
Daily
Axle jack and supports
Visual check.
Monthly
Mechanical parts
Grease all mechanical parts.
3 months
Hydraulic system
Check fluid reservoir and top up if nec-
essary.
Check hydraulic system for leakage.
Check condition of sealing sleeves, re-
place if necessary.
Check pump for unusual noise during
operation, check fastening screws for
firm fit.
6 months
Hydraulic fluid
Check fluid for dirt and aging, replace if
necessary.
12 months
General inspection
Check all components for damage.