BA081101-en
19
3.4.3 Lift
with
Permanent Inclination Device
Press and hold the RAISE button until the runway supports become
accessible.
Remove the supports from under both runways.
Lower the lift. After the lift has reached bottom position keep holding the
LOWER button for a few seconds.
Lift with Set-on-Locks function: The green signal lamp lights up once the lift
has reached bottom position.
Raise the lift to a convenient height.
Reinsert the runway supports.
Summary of Contents for DUO GN Series
Page 8: ...4 BA081101 en...
Page 11: ...BA081101 en 7 Overview of DUO GN Lift with Wheel Free Jack...
Page 14: ...10 BA081101 en...
Page 30: ...26 BA081101 en...
Page 37: ......