11
BA550401-en
2.4
Sample Nameplate
PIT JACK
Ser. No. / Date of Production:
***
Project:
***
Type:
***
Load Capacity:
***
Max. Hoisting Height:
***
Net Weight:
***
3
Transport and Storage
NOTICE
Check package to ensure it is complete, in accordance with the order confirmation.
Report any transport damage to the carrier immediately.
During loading, unloading and transport always use suitable lifting equipment, material
handling equipment (e.g. cranes, forklifts, etc.) and the right load handling attach-
ments and slings. Always ensure that the parts to be transported are suspended or
loaded properly so that they cannot fall, taking into account size, weight and the cen-
tre of gravity.
Store the packages in a covered area, protected from direct sunlight, at a low humidity
and with temperatures between 0...+40 °C (32…104 °F). Do not stack packages.
When unpacking, take care to avoid any possibility of injury or damage. Keep at a safe
distance when opening the package strapping, do not allow any parts to fall out.
4
Installation and Initial Operation
WARNING
Installation and commissioning of the equipment must be carried out by specially
trained personnel, authorised for the task. Specialist personnel includes authorised,
trained skilled staff from the manufacturer, the dealer and the relevant service part-
ners.