16 Series, Model - 2816 4WD
RUN-IN
PROCEDURE
If
run-in
instructions
for
a
new
engine
are
not
followed,
you
can
cause
damage
to
piston
rings
and
cylinder
walls.
LOAD
Never
operate
an
engine
immediately
under
full
load.
Allow
the
engine
to
warm
up
before
operating
it
at
full
load.
Run-in
the
engine
carefully
as
shown
in
the
table.
NO LOAD
Do not run the engine at idle speed. When not operating the engine with
a load, you can keep the correct engine operating temperature if you run
the engine at approximately 1500 RPM.
REAR WHEEL
BOL
T
S
After the first 10 hours of operation, check the rear wheel bolts. T
ighten
all wheel bolts to the torque given in the Wheel Mounting T
orques in this
manual.
FRONT WHEEL
BOL
T
S
After the first 10 hours of operation, check the front wheel bolts. T
ighten
the bolts to the torques shown in the Wheel Mounting T
orques in this
manual.
FRONT FRAME BOL
T
S
After the first 10 hours of operation, check the front frame bolts. T
ighten
the bolts to the torque shown below
.
Front Frame Mounting T
orques
Side (M12x35), 8 Bolts (4LH and 4RH)
...
83 to 93 Nm (61 to 69 lb ft)
LOWER LINK BRACKET
BOL
T
S
After the first 10 hours of operation, check the lower link bracket bolts.
T
ighten the bolts to the correct tightening torque 39 to 44 Nm (29 to 33
Ib ft).
Full load governed
speed with occasional
short periods of lighter
load.
Fully
advanced
1st Hour
2nd
Through
5th Hour
Fully
advanced
Period
Engine Speed
Control Lever
Position
Load
Maintain engine speed
100 RPM above full load
governe
d speed.
43
OPERA
TING INSTRUCTIONS
____________________________________________