30
LOADER INSTALLATION
STEP 11.
Remove the plug from the
“POWER BEYOND” port of the Hydraulic
Control Valve (located on the right hand
side of the valve and marked “PB”). Into
this port install the Power Beyond Sleeve
provided in the mounting kit (if not already
installed).
STEP 12.
Attach a 3/8” x 42” hose with
fittings to the “IN” port on the Hydraulic
Control Valve. Attach a 90
°
hydraulic
adapter to the “POWER BEYOND” port on
the Hydraulic Control Valve and attach a
3/8” x 44” hose with fittings to the Hydraulic
Adapter. Attach a 3/8” x 42” hose with
fittings to the “OUT” port on the Hydraulic
Control Valve. Route the hoses down the
top and outside of Hydraulic Control Valve
Stand and secure hoses as shown with a
plastic tie strap supplied with loader kit.
STEP 13.
When installing loader only on
tractor
attach a 90
°
hydraulic adapter to
each port insuring proper orientation as
shown in the figure to the right. To install
the 90
°
hydraulic adapters locate the three
hydraulic ports located on the right hand
side and in front of the rear mount and
remove metal plugs. Attach the 3/8”
Hydraulic Hose connected to Loader
Hydraulic Valve “IN” Port to the Outlet Block
Pressure Port “P”. Attach the 3/8”
Hydraulic Hose connected to Loader
Hydraulic Valve “OUT” Port to the Top Port
in the Hydraulic Outlet Block “T”. Attach the
3/8” Hydraulic Hose connected to Loader
Hydraulic Valve “PB” Port to the Bottom
Port in Hydraulic Outlet Port “N”.
PB
PB
Out
Tank
In
Pressure
Secure
Out
Tank
In
Pressure
1
6
Series, Model - 2
816