ABOUT THIS MANUAL
This manual has been prepared to assist you in following/adopting the correct procedure for running-
in operation and maintenance of your new Mahindra Tractor.
Your Tractor has been designed and built to give maximum performance, with good fuel economy
and ease of operation under a wide variety of operating conditions.
Prior to delivery, The tractor was carefully inspected, both at the factory and by your Mahindra
Dealer/Distributor, to ensure that it reaches you in optimum conditions .
To maintain this condition and ensure trouble free performance. it is important that the routine
services, as specified in this manual, are carried out at the recommended intervals.
Read this Manual carefully and keep it in a convenient place for future reference.
If at any time you require advice concerning your Tractor, do not hesitate to contact your Authorized
Mahindra dealer/Distributor.
He has trained personnel, genuine parts and necessary equipments to undertake all your service
requirements.
Mahindra policy is one of continuous improvement, and the right to change prices, specifications or
equipments at any time without notice is reserved.
All data given in this book is subject to production variations.
Dimensions & weight are approximate only and the illustrations do not necessarily show Tractors in
standard condition.
For exact information about any particular Tractor, please consult your Mahindra dealer/Distributor.
10
Summary of Contents for 4010 HST
Page 2: ... Mahindra USA Inc 5203 Aeropark Drive Houston TX 77032 281 449 7771 www mahindrausa com ...
Page 33: ...DECALS ON THE CHASSIS 31 ...
Page 34: ...32 DECALS AROUND THE SEAT ...
Page 49: ... OPERATING THE 3 POINT LINKAGE TPL 47 ...
Page 89: ... POWER TRAIN 87 38PS ...
Page 91: ...DATE TRACTOR HOURS NATURE TYPE OF REPAIR SERVICE CARRIED OUT SERVICE RECORD 89 ...
Page 93: ...PART REPLACEMENT RECORD DATE PART DESCRIPTION Q TY COST DATE PART DESCRIPTION Q TY COST 91 ...
Page 103: ......
Page 105: ......
Page 106: ...1 SAFETY PRECATIONS PRECAUTIONS BEFORE OPERATION 1 2 1 ...
Page 112: ...2 EXTERIOR VIEW 2 2 SERVICING 2 3 PRECAUTIONS BEFORE OPERATION 2 ...
Page 115: ......
Page 121: ......
Page 122: ...4 DAILY CHECKS 4 2 BREAK IN 4 2 PERIODIC CHECKS 4 3 BREAK IN AND CHECKS 4 ...
Page 125: ......
Page 141: ......
Page 149: ......
Page 150: ...7 SPECIFICATIONS 7 2 SPECIFICATIONS 7 ...
Page 155: ......
Page 156: ...8 INDEX 8 2 INDEX 8 ...
Page 159: ......