SPECIFICATIONS
Model: 4010 HST
ENGINE
Four strokes, Indirect injection, water-cooled
Diesel Engine.
Model : 3B183LW (DAEDONG)
No. of cylinders : 3
Displacement : 1,826cm
3
Bore : 87 mm (3.43 in)
Stroke : 102.4 mm ( 4.03 in)
Compression Ratio : 22:1
Horse Power (HP) : 38/ 2700rpm
(Manufacturing rating)
Rated Speed : 2,600 rpm
High idle rpm : 2800 rpm
Low idle rpm : 1000 rpm
Fuel injection pump : Indirect
Cylinder sleeve : Dry
Air Cleaner : Dry Filter element, paper
element filtering
Firing order : 1-2-3
Exhaust Muffler : Horizontal Round.
Accelerator : Hand Accelerator
ELECTRICAL STARTING AND LIGHTING
Battery Capacity : 12V 80AH
Starter : Solenoid Engaged.
Key Start with Safety ,
starter switch
Alternator :12V 50A
Instrumentation : Hour meter, Tacometer
Fuel gauge.
Water Temperature Gauge.
Warming Lights.
Lighting: : Head lights,
Turn Signal Indicator Lamp,
Rear Parking, Brake Lamp
Tail Lamp
CLUTCH
Type
: Damper
TRANSMISSION
Type : synchro mesh
No. of gears : 3 Speed forward,
3 Speed reverse
with high and low
selection lever with
HST unit
STEERING
Type : Hydraulic power
(Power steering)
POWER TAKE OFF
Mid mounted : 6 splines
Rear mounted : 6 splines
Diameter : 1
⅜
in.
Standard PTO : Rear -540/2,775 engine rpm
Mid – 2000rpm
BRAKES
Foot operated, independent with provision of
inter lock for simultaneous operation.
A foot brake is fitted for parking.
Inner dia. : 160 mm (6.30 in)
Outer dia. : 210 mm (8.23 in)
Number of lining : 4 each side
Total brake thickness : 1.96 in
HYDRAULIC SYSTEM
3 Point linkage : Category 1
(Adjustable outside check chains)
77
Summary of Contents for 4010 HST
Page 2: ... Mahindra USA Inc 5203 Aeropark Drive Houston TX 77032 281 449 7771 www mahindrausa com ...
Page 33: ...DECALS ON THE CHASSIS 31 ...
Page 34: ...32 DECALS AROUND THE SEAT ...
Page 49: ... OPERATING THE 3 POINT LINKAGE TPL 47 ...
Page 89: ... POWER TRAIN 87 38PS ...
Page 91: ...DATE TRACTOR HOURS NATURE TYPE OF REPAIR SERVICE CARRIED OUT SERVICE RECORD 89 ...
Page 93: ...PART REPLACEMENT RECORD DATE PART DESCRIPTION Q TY COST DATE PART DESCRIPTION Q TY COST 91 ...
Page 103: ......
Page 105: ......
Page 106: ...1 SAFETY PRECATIONS PRECAUTIONS BEFORE OPERATION 1 2 1 ...
Page 112: ...2 EXTERIOR VIEW 2 2 SERVICING 2 3 PRECAUTIONS BEFORE OPERATION 2 ...
Page 115: ......
Page 121: ......
Page 122: ...4 DAILY CHECKS 4 2 BREAK IN 4 2 PERIODIC CHECKS 4 3 BREAK IN AND CHECKS 4 ...
Page 125: ......
Page 141: ......
Page 149: ......
Page 150: ...7 SPECIFICATIONS 7 2 SPECIFICATIONS 7 ...
Page 155: ......
Page 156: ...8 INDEX 8 2 INDEX 8 ...
Page 159: ......