background image

|

L A D E N M Ü H L E N

S H O P   G R I N D E R

5. 

If the adjustment you have made does not come up to your expecta-
tions you can adjust the grind degree as described above. 

6.  Place the rotary knob on the adjusting spindle so that the arrow of 

the knob is positioned precisely on the symbol „fine“. Clockwise ro-
tation must no longer be possible. 

 

 

 

It is important that the rattling sound cannot be  

 

 

heard in the finest grinding position. Otherwise the  

 

 

service life of the grinding discs is reduced 

   

considerably!

7.  Insert the fastening screw of the rotary knob and tighten it firmly 

with a screwdriver.

If the result is not good enough the grinder needs to be cleaned or you 
have to change the grinding discs.

9. Cleaning

Always pull the power supply plug out of the outlet 
before carrying out any maintenance or cleaning 
work on the device!

Observe the safety instructions under 1.2!

Do not let any foreign objects fall into the grinding 
mechanism!

Adjusting spindle

8. Recalibration of the Grind Adjustment

The grinder has been precisely adjusted by the manufacturer. However, 
if the ground material is no longer fine enough after a longer period, the 
grinder must then be re-adjusted according to the following procedure:

1.  Use a screwdriver to unscrew the fastening screw in the middle of 

the rotary knob and remove the rotary knob.

2. 

Switch on the grinder.

3.  Then rotate the exposed adjusting spindle (see Fig.) very carefully 

and slowly in clockwise direction until a slight rattling noise (con-
tact of the grinding discs) can be heard and then rotate the adjust-
ing spindle immediately back again in anticlockwise direction up to 
the next notch. It must no longer be possible to hear a rattling noise 
of the grinding discs!

4. 

If you grind some beans now, you should get fine grains. If the coffee 
beans have been ground too fine, the discs can stick together. The 
grinder would be blocked.

page 10

Coffee Laboratory 589 Rappahannock Drive White Stone Va 22578 TEL (866) 244-1578 www.coffeelabequipment.com

Summary of Contents for Guatemala K22S)

Page 1: ...H O P G R I N D E R The professional art of grinding since 1924 Operating Instructions Guatemala K32S K22S the casual one Coffee Laboratory 589 Rappahannock Drive White Stone Va 22578 TEL 866 244 1578 www coffeelabequipment com ...

Page 2: ... L A D E N M Ü H L E N S H O P G R I N D E R Coffee Laboratory 589 Rappahannock Drive White Stone Va 22578 TEL 866 244 1578 www coffeelabequipment com ...

Page 3: ...tallation 7 5 3 Initial operation 7 6 Operation 8 page 3 7 Operating Faults 8 8 Recalibration of the Grind Adjustment 10 9 Cleaning 10 9 1 Cleaning with GRINDZ Grinder Cleaner 11 9 2 Cleaning of the Grinder Casing 11 9 3 Cleaning of the Grinding Mechanism 11 10 Maintenance and Repair 12 11 Spare Parts 12 12 Certificate 13 13 Warranty Conditions 13 14 Wiring Diagram 14 Coffee Laboratory 589 Rappahan...

Page 4: ...out proper supervision Never immerse the grinder in water and do not oper ate it with wet hands page 4 1 Safety Please read and observe the following operating in structions carefully Non observance can result in damage to the grinder as well as in health threaten ing risks for the user 1 1 Symbols The following two symbols are used in this manual of operating instruc tions Safety instruction In c...

Page 5: ...nscious basis is also expected 2 Technical Data Description Guatemala K32S K22S Voltage Frequency 220 240V 50 60Hz 115V 60Hz 100V 50 60Hz Rotation 50 Hz 2850 rpm 60 Hz 3400 rpm Sound emission idle operation 65 dB operation 85 dB Pre fuse 16 A slow Overload circuit breaker 230V 50Hz 7A T 220V 60Hz 8A T 115V 60Hz 16A T incl in switch 100V 50Hz 10A T 100V 60Hz 16A T incl in switch max operating time ...

Page 6: ... with lid Pos 2 Grind adjustment Pos 3 Spout Pos 4 Bag holder Pos 5 Tray for residues Pos 6 On Off Switch Pos 7 Reset button for current overload back Pos 8 Bag holder handle Pos 9 Casing with motor and grinding mechanism 1 2 3 4 5 8 9 7 6 Coffee Laboratory 589 Rappahannock Drive White Stone Va 22578 TEL 866 244 1578 www coffeelabequipment com ...

Page 7: ...ic circuit of the motor when the device is sub jected to electric overloading To be able to re start the grinder the reset button on the back side of the casing must be pressed Pos 7 The user has no influence whatsoever on this opera tion In case of repeated tripping of the circuit break er an expert must be consulted since this could cause damage to the motor winding Motor protector winding shield...

Page 8: ...on 1 By moving the rotary knob set the required grind degree to the left for coarse coffee powder to the right for finer coffee powder 2 Only fill unground materials for which the grinder is set up for into the hopper Close the hopper 3 Press down the handle of the bag holder pos 8 and push the com pletely opened bag which has been smoothed along the folds over the spout pos 3 Let go of the handle a...

Page 9: ...out let Check to determine wheth er the reset button of the circuit breaker has jumped out Press the reset button in again if appropriate In case of repeated tripping of the circuit breaker contact your authorised customer service centre or dealer Give the grinder a cooling off break of at least 100 minutes para 4 Check the pre fuse Restore the pre fuse to its initial state or replace it Deter min...

Page 10: ...ign objects fall into the grinding mechanism Adjusting spindle 8 Recalibration of the Grind Adjustment The grinder has been precisely adjusted by the manufacturer However if the ground material is no longer fine enough after a longer period the grinder must then be re adjusted according to the following procedure 1 Use a screwdriver to unscrew the fastening screw in the middle of the rotary knob an...

Page 11: ...he grinding mechanism Pull out the power supply plug 1 Rotate the rotary knob 11 to coarse 2 Unscrew the two screws 13 on the grinder casing cover 12 and then remove this cover 3 Take the carrier 10 out of the slot of the pre breaker 4 Pull the pre breaker 9 off the motor shaft Use a special puller art no 4041 5 Clean the grinding mechanism with a fine brush and remove any foreign objects 6 Before ...

Page 12: ... by authorised experts Please contact an authorised customer service centre or your local dealer 10 1 Grinding Disc Replacement If the grind capacity decreases and the ground coffee is hot and of irregu lar grind size you should change the grinding discs 1 Take the grinder apart as described in para 9 3 and remove the grinding discs from the grinder casing and the pre breaker using a screwdriver 2...

Page 13: ...rer MAHLKÖNIG GmbH Co KG Tilsiter Straße 142 D 22047 Hamburg Tel 49 0 40 69 69 40 0 Fax 49 0 40 69 39 72 1 hereby declares that the below mentioned product product type device for food processing machine description Coffee grinder machine typ K32S Guatemala is in compliance with the following directives and regulations The provisions of the Machinery Directive 2006 42 EG The Low Voltage Directive ...

Page 14: ...7k K1 Motor Start Relay Klixon 2CR3 207 F1 Current Overload Switch ETA 2 5700IG1 P10 1050 7A S1 Switch ETA 3120 F30F G701 SGRX 20A M1 Motor Elnor 270 CII 230V 50Hz X1 Mains plug X2 Blade Terminal 6 3mm 14 Wiring Diagram Coffee Laboratory 589 Rappahannock Drive White Stone Va 22578 TEL 866 244 1578 www coffeelabequipment com ...

Page 15: ... L A D E N M Ü H L E N S H O P G R I N D E R Notes Coffee Laboratory 589 Rappahannock Drive White Stone Va 22578 TEL 866 244 1578 www coffeelabequipment com ...

Page 16: ...G GmbH Co KG Tilsiter Straße 142 D 22047 Hamburg Germany Tel 49 0 40 69 69 40 0 Fax 49 0 40 69 39 721 office mahlkoenig de www mahlkoenig de March 2014 Subject to be changed without prior notice Coffee Laboratory 589 Rappahannock Drive White Stone Va 22578 TEL 866 244 1578 www coffeelabequipment com ...

Reviews: