10. Mounting preparations
15
14 Main duct (steel folded spiral-seams
duct)
15 ER GH connection duct: Flexible
aluminium duct
17 Floor ceiling
18 Steel threaded rod / stair bolt
19 Duct attachment
Fig. 5
20 Duct clamp / clamping band
22 Ceiling compound
23 Shaft wall
24 Wall/board seal
25 Suspended ceiling
26 Steel screws or steel blind rivets
(3 of each)
27 Dowel:
27.1 Plastic dowel or anchor bolt
27.2 Metal expansion dowel
28 Retaining bolt with nut
29 Retaining bolt
30 Steel clamping band
Be sure to note the approval and
mounting information in chapter 10.2.
Duct attachment with duct clamp,
alternatively duct attachment with
clamping band
Ensure a spacing of max. 1.5 m
between the duct attachments [19].
4
5
Summary of Contents for ER GH
Page 2: ...2 1 ...
Page 31: ...31 ...