11. Housing installation
‒ ER GH ‒ second room
23
11.1 Installation socket for second room
Ø 75/80
11.2 Adapter
11.3 G2 filter mat
11.4 Internal grille
12 Suction duct, second room connection:
flexible aluminium duct AFR 75/AFR 80
16 Power cable
31 Mounting support UPM 60/100 (2 items)
33 Expanded rubber ER-MO
X4 Clamping band or steel threaded rod
with duct clamp
chapter 11.3
11.1.7
Ceiling installation ER GH ‒
second room
Observe mounting information in
chapter 11.1.2.
1. Mount ER GH housing on ceiling as
described in chapter 11.1.5.
2. Mount second room connection ER-ZR on
ceiling as described in chapter 11.1.6.
Secure ER-UP housing and the
connection cable with 2 mounting
supports [31] and/or clamping
bands/threaded rods each.
12
Summary of Contents for ER GH
Page 2: ...2 1 ...
Page 31: ...31 ...