11. Installation preparations
13
11. Installation preparations
Suitable mounting material is to be
supplied by the customer.
11.1 Requirements in line with
approval
ER-UP/G +
ER 60/100/
Second room
ER-UPD +
ER 60/100/
Second room
ER-UPB +
ER 60/100
ER-UPB
Second room
Number of units
per floor, living
unit or fire zone
Max. 3 fans or
3 connections
Max. 3 fans or
3 connections
Max. 3 fans or
3 connections
Max. 3 fans or
3 connections
Connection
diameter
Ø 75 or Ø 80 mm
Shaft
wall
Any board
material
Min. 35 mm
board material
F90
Min. 35 mm
board material
F90
Min. 35 mm
board material
F90
Connection
ducts
inside the shaft
E.g. flexible
aluminium duct
AFR 80
between main
duct
in shaft and
ER unit, max.
2 m long
(
approval).
Steel folded
spiral-seams
duct between
main duct in
shaft and
ER unit,
max. 2 m long
(
approval).
Flexible
aluminium duct
AFR 80 or steel
folded spiral-
seams duct
between main
duct
in shaft and
ER unit, max.
2 m long
(
approval).
Flexible
aluminium duct
AFR 80 or steel
folded spiral-
seams duct
between main
duct in shaft and
ER unit, max.
2 m long
(
approval).
Steel folded
spiral-seams
duct between ER
unit and second
room connection.
Connection
ducts outside
the shaft
E.g. flexible
aluminium duct
AFR 80
between main
duct
in shaft and
ER unit, max.
2 m long
(
approval).
Steel folded spiral-seams duct Ø 75 or Ø 80
between main duct in shaft and
ER unit, max. 2 m long (
approval).
Duct elbows
in unit
connection duct
max. 90° bend, ascending
Summary of Contents for ER-UP/G
Page 3: ...1...