11. Installation preparations
17
18 Main duct (steel folded spiral-seams
duct)
19 Connection duct
ER-UPB, ER-UPD: Steel folded spiral-
seams duct
ER-UP/G: Flexible aluminium duct
21 Floor ceiling
22 Steel threaded rod / stair bolt
23 Duct attachment
Fig. 5
24 Duct clamp / clamping band
25 Spigot
26 Ceiling compound
27 Shaft wall
28 Wall/board seal
29 Suspended ceiling
30 Steel screws or steel blind rivets
(3 of each)
31 Steel dowel:
31.1 Steel dowel or anchor bolt
31.2 Metal expansion dowel
32 Retaining bolt with nut
33 Retaining bolt
34 Steel clamping band
Be sure to note the approval and
mounting instructions in chapter 11.2.
Duct attachment with duct clamp,
alternatively duct attachment with
clamping band
Ensure a spacing of max. 1.5 m
between the duct attachments [23].
4
5
Summary of Contents for ER-UP/G
Page 3: ...1...