12. Installation ‒ ER-UP/G ‒ second room
24
6
Protective grille
7
Filter mat, filter class G2
8
Adapter
9
Suction duct, second room connection:
flexible aluminium duct AFR 75/AFR 80
10 Installation socket for second room
extraction Ø 75/80
13 Housing floor seal
37 Mounting support UPM 60/100
(2 items)
S
Housing segment
12.1.6 ER-UP/G wall installation, second
room
1. Cut out the desired housing segment "S"
(left, right or bottom) at the marking with
a knife.
NOTICE
The unit will be damaged and function
impaired by incorrect air if the plastic
socket is inserted incorrectly. Protection
class is no longer guaranteed.
Lift up housing floor seal [13] near
socket and insert installation socket [10].
Reposition housing floor seal correctly.
2. Place installation socket [10] in ER-UP/G
housing. The edge of the socket must click
into place on the wall of the housing.
3. Install housing as described above for
"single room".
4. Connect suction duct [9] with installation
socket [10] sealed for ventilation.
5. Produce fixing holes for adapter [8] and
insert dowels.
6. Connect adapter [8] to suction duct [9],
e.g. with cold-shrink tape.
7. Secure adapter [8] to the wall.
8. Insert filter mat [7] and locate protective
grille [6] in the correct position.
With second room extraction, keep
regulating plate [16] (
Fig. 1) for
final installation. This is needed to
operate the ER 100 fan insert and
is inserted in the cover [15]
(
Fig. 1).
9
Summary of Contents for ER-UP/G
Page 3: ...1...