12. Installation ‒ ER-UPB - second room
31
5.1 Steel connection socket Ø 75/80
for second room extraction on ER-UPB
6 Protective grille
7 Filter mat, filter class G2
8 Adapter
9 Suction duct, second room connection:
Steel folded spiral-seams duct Ø 75/80
13 Housing floor seal
37 UPM 60/100 mounting support
12.3.5 ER-UPB/R, ER-UPB/L and
ER-UPB/U installation (second room)
1. Install ER-UPB housing as described in
chapter 12.3.4.
2. Secure suction duct [9] and steel socket
[5.1] with 3 steel blind rivets [41] or steel
screws and connect sealed for ventilation.
3. Produce fixing holes for adapter [8] and
insert dowels.
4. Connect adapter [8] to suction duct [9],
e.g. with cold-shrink tape.
5. Secure adapter [8] to the wall with screws.
6. Insert filter mat [7] and locate protective
grille [6] in the correct position.
With second room extraction, keep
regulating plate [16] (
Fig. 1) for
final installation. This is needed to
operate the ER 100 fan insert and is
inserted in the cover [15] (
Fig. 1).
14