22. Wiring diagrams
46
ER 60 GVZ, ER 100 GVZ
Standard switching
Switching options
ER 60 GVZC EC
Standard switching
ER 60 GVZ, ER 100 GVZ
Standard switching:
Fan always runs at base load. When the
room is in use (S1=On), the fan switches
automatically to full load after approx.
50 seconds.
Switching option
When the room is in use (S1=On), the fan
switches automatically to full load after
approx. 50 seconds. Base load operation
can be switched off manually with switch S2.
ER 60 GVZC EC
Standard switching
The unit permanently runs at least at base
load. The base load level cannot be switched
off manually.
If the room lighting is switched on (S1 = On),
the fan switches to nominal load after the
preset start delay of 0 to three minutes which
can be set using a jumper.
After the room lighting is switched off, the fan
continues running for an overrun time of up to
15 minutes. The overrun time can be set to
between 0 and 15 minutes using a jumper.
Then the fan switches back to the base load
level.
For setting the start delay and overrun time
chapter 7.1. Note the overrun time stated
on the general building approval.