background image

For Questions Regarding Installation, Please Contact Main Access Customer Service 1-888-333-1134 or 

Info@MainAccess.com

iSTEP

Model #200601T Assmebly Instructions 

Step 21: Pool Installation

Step 22: Deck Mount Installation

*Optional* Purchase (2) Anchors (#200888) to weigh 
down the iStep. Sand not inlcuded. 

          All Finished!

Note: Two people are required for installation.
A total weight of approximately 100 lbs. is 
required to keep the step from moving once in 
place under water.  With the assistance of another 
person, carefully place the step in the pool. Place 
the two sealed bags of sand (not included) in 
ballast bags (M) over the ballast tray (D) to hold 
the step in place. Walk step back againast the pool 
wall to prevent swim behind hazards.

With the step in position close to the pool wall, 
slide the deck connectors (H) intstallation position 
on either the pool top seat or pool deck. Secure to 
the deck with two #8 x 1" screws (N). Use a 
minimum of two screws per deck connector. 
Secure each deck connector (H) to each upper 
handrail (E1) by using a single #8 x 1" screw. 

Reviews: