15
5.4 Safety systems
The following safety measures are the prerequisite for safe operation of your system.
Emergency stop switch
Every heating system must be able to be switched off with an Emergency Stop switch.
The Emergency Stop switch location is determined by your local code requirement.
It should remove all electrical power from the boiler.
Safety valve / Over Pressure Relief Valve
This valve opens when the pressure inside the heating system increases to max. 43.5 PSI.
For North America, a 30 PSI Relief Valve is supplied with each boiler. This valve must not be
locked out or plugged and must be within 3 feet of the boiler, with no valves between the
relief valve and boiler.
Low Water Detection
The "Low Water Detection" device is connected to the Emergency Stop of the boiler.
Should a low water condition be detected, the boiler stops firing immediately. This device
must be of the manual reset variety.
Safety temperature sensor
The pellet boiler is equipped with a safety temperature sensor. This is located on the pellet
boiler. If the boiler temperature exceeds 230° F, then the heating system switches off.
Expansion tank
All heating systems must be equipped with an expansion tank.
The overall size of the heating system volume will dictate the required expansion tank size.
IIn
niittiia
all sstta
arrtt--u
up
p
The initial start-up of each MESys boiler must be per-
formed by an authorized installer.
5.5 Installation with an existing boiler
MESys boilers are not to be connected to a chimney flue serving another appliance. However, when all State
and local codes allow for the sharing of chimney flues, MESys boilers and another appliance burning pellets
or a different fuel can be operated simultaneously while connected to a single existing chimney or flue gas
system providing the following conditions are met:
• All state and local codes permit the specific installation.
• All appliances are installed in accordance with the manufacturer’s installation specifications or if lacking
manufacturers specifications, the appliance in question is installed in a manner commonly recognized as
safe and correct for the application and circumstances.
• The chimney or flue gas system must be able to handle the combustion products of either appliance and
both appliances when operated simultaneously.
A
Av
vo
oiid
d c
clle
ea
arra
an
nc
ce
e iissssu
ue
ess tth
ha
att c
ca
an
n m
ma
ak
ke
e sse
errv
viic
ciin
ng
g
d
diiffffiic
cu
ulltt::
Be sure to follow suggested clearances when installing
this boiler with an existing boiler to be sure that service
and cleaning can be performed adequately.
Operating Manual AutoPellet® PES 20, 32, 56
Summary of Contents for PES 20
Page 26: ...PE 568 USA 2 0 26 Setting language date and time at Pelletronic Touch...
Page 32: ...Menu navigation of Pelletronic Touch PE 568 USA 2 0 32 Main Menu...
Page 57: ...Favorite 57 Operating Manual AutoPellet PES 20 32 56...
Page 92: ...PE S K B 36 56 PE 568 USA 2 0 92 Cleaning the boiler every year...
Page 100: ......
Page 101: ......