S12800 Routing Switch Installa
tion Manual V1.0
Maipu Confidential & Proprietary Information
Page 27
For the dimension of SM12800-12-MF (V1), refer to
1.1 Device Appearance and Hardware
Step 2:
Maintain the level of the tray, the tray is installed to the marked position, and
lock the fixing screw.
The appearance and installation method of different kinds of cabinets and pallets are
different. The content of the section is just for reference. Please subject to the actual
situation.
3.1.4 Install Floating Nut to Cabinet
Before installing the chassis to the cabinet, first install the floating nuts on the upright square
hole bars at the both sides in the front of the cabinet.
Step 1:
Take out the installation positioning plate of the floating nuts from the accessory
bag of the accessory box. Mark the installation position of the floating nut on the
square hole post of the cabinet by comparing with the hole position on the
positioning plate.
Figure 3-4 Mark the position of installing the floating nuts
1. Installation positioning plate of the floating nut
2.Square hole post
3. Cabinet post
4. Pallet