Archangel Installation Guide
3
Page 6 of 17
Reposition the vertical wall channel and insert the top and bottom screws to hold it in
place. Insert the rubber spacer strip into the floor channel and cut to length.
Using suction glass lifters, lift the fixed glass panel into the
channels. Make sure that the panel is plumb vertical.
If necessary, use additional short pieces of rubber strip in the floor channel to adjust the height and
level of the glass. Take note of their positions. Do not use more than 3 thicknesses of rubber strip in
any one position.
The glass panel can be moved backwards or forwards in the floor channel but the glass must
be inside the vertical wall channel by at least 3mm along its entire height.
Using a metal scriber, mark the floor channel at the end of the glass and mark the wall channel at the
top of the glass.