Cadiz Installation Guide - Surface Profiles
– v2022
8
The Majestic Shower Company Limited
17 Flitch Industrial Estate, Chelmsford Road, Dunmow, CM6 1XJ
Tel44 (0) 8448 001 500
Fac44 (0) 1279 635 074 info@majesticshowers.com www.majesticshowers.com
Panel
Return
Using suction glass lifters, lift the Return panel into the wall profile channel and carefully
lower into the underframe channel.
Ensure that the Return panel is pulled forward in the underframe to align as shown.
10
Check that the front edge of the Return panel is plumb vertical, using additional
rubber strips under the glass if necessary to pack it up and noting the position of
these strips.
Do not use more than 3 thicknesses of rubber under the glass.
FR
O
N
T
un
derfr
am
e
9