7
1 - Transformer Jaw: designed to
pick up the AC and DC current
flowing through the conductor.
It could transfer current to
voltage. The tested conductor
must vertically go through the
Jaw center.
2 - Hand Guards: to protect user's
hand from touching the
dangerous area.
3 - MR button (recall data)
4 - SEL / ▲ button (press to select
phase and sum of Watts
measurement)
5 - MAXMIN / ▼ button
6 - SAVE button (data store button)
5.2. The Meter Front Structure (see figure 2)
7 - LCD Display
8 - L2 Input Terminal
(Second phase measurement)
9 - L3 Input Terminal
(Third phase measurement)
10 - COM Input Terminal
11 - L1 Input Terminal
(First phase measurement)
12 - USB button
13 - CLEAR button
14 - LIGHT button (auto display
backlight button)
15 -
Σ
button (Sum)
16 - HOLD button
17 - Rotary function switch
18 - NCV indicate lamp
Figure 2
Summary of Contents for MT790