BOXER SERIES 10-20 KVA
PRODUCT DESCRIPTION
AG-SD-109 Publishing Date: 13.10.2015 Revision No: 0 Rev. Date:
2.3.1 Advanced Level Functions (Automatic Battery Test)
The auto battery test automatically discharges 10% of the battery existing capacity in a certain
period defined (default is 90 days). The period between two tests can be adjusted by user
between 30-360 days. At the end of the test, one of these two status, “
good or replace
” is
determined.
At the end of this test, if batteries are reported as “replace”, then the
batteries are completely drained after the test. In this case, loads can
remain unpowered in case of mains power off.
This test can automatically be started by command from front panel monitor, via telnet interface,
via RS232 smart communication or via UPSMAN (SNMP, see the options).
As a result of all these tests, it is checked whether the batteries that are presently used can
supply the minimum needs of loads in case of the first power-off or not. It is recommended that
test results be checked at regular intervals.