BOXER SERIES10-20 KVA
INSTALLATION
AG-SD-109 Publishing Date: 13.10.2015 Revision No: 0 Rev. Date:
3.1.2 Pre-Installation Check Up
Before installing the UPS product, the following checks should be carried on. These are the first
and important steps in the operation of the product correctly.
Definitely check whether or not any damage was done to internal and external structures
of the UPS, accessories and batteries during transportation or shipment. Report any
damages before receiving.
Make sure that the product is the right model. Check whether the label behind the device
matches with the product ordered or not.
3.1.3 Positioning
The UPS and the batteries are designed for indoor use, and must be placed on a clean area with
cool air flow.
3.1.3.1 Positioning the UPS
For the Boxer 10-20 KVA Series, fresh and cool air enters the device from the front side and goes
out through the fans on the back side of the device. Air entrance and exit points should never be
closed. It must be positioned on a place where is protected from water or similar liquid contact
risks.
If the area is very dusty, filters optional provided must be used. Usage of these filters must be
done according to the relevant instructions.
The UPS is structurally a losing-energy system. Lost energy occurs as temperature. How forced
air cooling system is needed is provided in the following table. Using the table, what capacity of
air conditioned should be used to cool the place where the UPS is can be determined.
Device
BTU/h amount for
cooling
Estimated BTU/h value
For 100%Bridge Load
(Non-Linear Load) Operation
10KVA
2,663
3,196
15KVA
3,790
4,548
20KVA
3,892
4,670