BOXER SERIES10-20 KVA
INSTALLATION
AG-SD-109 Publishing Date: 13.10.2015 Revision No: 0 Rev. Date:
ATTENTION! 3 pole-circuit breakers (switch) are used for the input and
output of the UPS, Neutral line is not interrupted.
Please, follow the steps below for electrical
connections:
1. Take all the breakers in the distribution boards
open circuit (OFF) position and make sure that loads
and the mains are isolated from cables
2. Remove the screws of the metal cover at the back of the UPS and take the board from its place.