BOXER SERIES10-20 KVA
INSTALLATION
AG-SD-109 Publishing Date: 13.10.2015 Revision No: 0 Rev. Date:
3. Connect the ground cable.
4. Make sure that all the circuit breakers are in the open circuit (OFF) position. The use of these
circuit breakers are explained in the next sections.