BOXER SERIES 80-120 KVA
OPERATION
AG-SD-37/ Publication Date: 19.10.2012/Rev. No:1/Rev. Date:16.11.2012
39
4.1.2 First Start-Up
NOTICE:
Wait at least 5 seconds between each step.
1. Switch all the breakers to open circuit (OFF) position.
2. Push the Soft Start button (SW1) for minimum 10 seconds.
3. Switch the input breaker (CB1) and external bypass switches (CB5) to closed circuit (ON)
position.
4. Start the UPS using the front panel.
Main Menu>Control>Password>Start