TRANSFORMER LEVELUPS T3 SERIES 160
–
200 KVA
OPERATION
41
GM-SD-06 / Publication Date: 13.04.2016 Revision No 2 Revision Date 30.01.2017
6. Turn battery circuit braker (CB4) ON.
7. Turn output circuit braker (CB3) ON.
8. The loads which are connected to UPS can be turned on.
After all these steps, check that load is fed through inverter static switches via mimic diagram. In
a contrary situation, check UPS total and phase loads. The UPS gives audio alerts in an overload
condition, without feeding critical AC loads.
4.1.3 UPS Operation Modes Testing
After first start-up check device operation by switching between the foperation. asdfasd modes
manually.