15150 25th Avenue North, Minneapolis, MN 55447-1981
Phone 763-476-8600 Fax 763-476-4092
For Service: MN 763-476-4191 IA 319-632-4288 NE 402-330-2323
Visit us at:
www.productivity.com
Productivity is ISO 9001:2000 Certified
Productivity Inc
®
Makino a61 PRE-INSTALLATION CHECKLIST
– Rev 2/2009
Installation of your new Makino a61 can be smooth and rapid if preparations are made prior to the delivery of your
machine. Any questions regarding machine installation should be directed to our service department for clarification.
We hope this checklist will aid in a rapid installation of your new machine.
NOTE: The following must be completed
prior to our service technician arriving at your facility to install the new machine.
¾
Power Requirements for your machine: 240v/3ph/48kVa** 240v/225Amp (Main Circuit Breaker)
NOTE: **86kVa (including options) See Makino Installation Manual or contact our Service Department for
complete information or questions. Machine is a dual-voltage machine and comes with a transformer.
Proper voltage per machine specifications should be ready at machine site.
Do NOT power up the machine.
¾
Customer should furnish and have available the proper supply and types of lubricants required for machine
operation.
See enclosed Makino Installation Manual for specifics – any questions should be directed to our
Service Department at the above locations.
ITEM CAPACITY
FLUID
TYPE
Coolant 106
Gallons
(may vary with type/size of tank
ordered – check Manual for specifics)
Water Soluble, Synthetic
You will need to have Coolant on hand at the time of installation. Contact our Service Department with any
questions.
¾
Air lines should be routed to the machine location and operational for proper air pressure.
Must have clean, dry air supply with less than 40% relative humidity in line. In-line water trap
recommended. 72-116 psi @ 23.9 cfm; we recommend ½” air line hose.
¾
Machine location should be planned to allow enough room for access panels to be opened and serviced with ease.
A minimum of 36” clearance is required around the machine for operator and maintenance access.
¾
Weight requirements should be checked to insure that the surface below the machine will have sufficient strength
for support and stability. The machine must be set on a solid, sound and stable, steel bar-reinforced concrete slab
poured directly on the grade. In general, the 6” concrete floor on industrial buildings is suitable for machine
placement.
¾
The Makino a61 can be moved with either a forklift or crane***.
Upon arrival of your machine, uncrate and
immediately check for visible damage.
SEE ATTACHED FOR SHIPPING DIMENSIONS.
***NOTE: LIFTING EQUIPMENT, ROPES, SHACKLES, LIFTING BARS, LIFTING BEAMS,
ETC. ARE OPTIONAL EQUIPMENT AND ARE NOT PROVIDED WITH THE MACHINE. ITEMS
MUST BE PURCHASED PRIOR TO MACHINE DELIVERY. CHECK WITH YOUR RIGGER TO SEE
IF THEY HAVE ANY OF THESE ITEMS.***
¾
Remove as much preservative from the machine as possible without having to power up (tables – slides,
pulleys, etc.). We recommend mineral spirits to clean. Apply oil when finished to prevent rust.