background image

 

 

 

 

 

15150 25th Avenue North, Minneapolis, MN  55447-1981 

Phone 763-476-8600     Fax 763-476-4092 

For Service:   MN 763-476-4191   IA 319-632-4288   NE 402-330-2323 

Visit us at:  

www.productivity.com

     Productivity is ISO 9001:2000 Certified 

Productivity Inc

®

   

 

 
 

Makino a61 PRE-INSTALLATION CHECKLIST 

– Rev 2/2009 

 
 
Installation of your new Makino a61 can be smooth and rapid if preparations are made prior to the delivery of your 
machine.  Any questions regarding machine installation should be directed to our service department for clarification.  
We hope this checklist will aid in a rapid installation of your new machine. 

NOTE: The following must be completed 

prior to our service technician arriving at your facility to install the new machine. 

 

¾

  Power Requirements for your machine:  240v/3ph/48kVa**  240v/225Amp  (Main Circuit Breaker)

 

NOTE: **86kVa (including options) See Makino Installation Manual or contact our Service Department for 
complete information or questions. Machine is a dual-voltage machine and comes with a transformer.

 

Proper voltage per machine specifications should be ready at machine site. 

Do NOT power up the machine.

 

 

¾

  Customer should furnish and have available the proper supply and types of lubricants required for machine 

operation. 

See enclosed Makino Installation Manual for specifics – any questions should be directed to our 

Service Department at the above locations.

 

 

ITEM CAPACITY 

FLUID 

TYPE 

Coolant 106 

Gallons 

(may vary with type/size of tank 

ordered – check Manual for specifics)

 

Water Soluble, Synthetic 

You will need to have Coolant on hand at the time of installation. Contact our Service Department with any 
questions. 

 

¾

  Air lines should be routed to the machine location and operational for proper air pressure.   

 

Must have clean, dry air supply with less than 40% relative humidity in line.  In-line water trap 
recommended. 72-116 psi @ 23.9 cfm; we recommend ½” air line hose. 

 

¾

  Machine location should be planned to allow enough room for access panels to be opened and serviced with ease.  

A minimum of 36” clearance is required around the machine for operator and maintenance access. 
 

¾

  Weight requirements should be checked to insure that the surface below the machine will have sufficient strength 

for support and stability. The machine must be set on a solid, sound and stable, steel bar-reinforced concrete slab 
poured directly on the grade.  In general, the 6” concrete floor on industrial buildings is suitable for machine 
placement.  
 

¾

 

The Makino a61 can be moved with either a forklift or crane***.   

Upon arrival of your machine, uncrate and 

immediately check for visible damage.  

SEE ATTACHED FOR SHIPPING DIMENSIONS.   

 

***NOTE: LIFTING EQUIPMENT, ROPES, SHACKLES, LIFTING BARS, LIFTING BEAMS, 

ETC. ARE OPTIONAL EQUIPMENT AND ARE NOT PROVIDED WITH THE MACHINE.  ITEMS 
MUST BE PURCHASED PRIOR TO MACHINE DELIVERY.  CHECK WITH YOUR RIGGER TO SEE 
IF THEY HAVE ANY OF THESE ITEMS.***

 

 
 

¾

 

Remove as much preservative from the machine as possible without having to power up (tables – slides, 
pulleys, etc.).  We recommend mineral spirits to clean.  Apply oil when finished to prevent rust. 

 

 

 

Reviews: