5 - 12
('*(
3UH,QVWDOODWLRQ*XLGH
8. Connect incoming power at
the top of CB1, terminals R,
S, and T (
9. Connect the facility ground
wire to earth ground (
).
10. Close the NC doors.
11. Do Not apply power at this
time. Leave the power dis-
connect turned Off, Locked
Out, and Tagged until the
FSE requests that power be
turned On.
Do NOT Apply Power
Leave the power BUSS or disconnect
Off, Locked Out and Tagged. The
FSE will confirm connections, incom-
ing voltage, and the transformer taps.
Failure to observe this DANGER may
result in serious damage or personal
injury.
F
IGURE
5-7
POWER
CONNECTION
TO
CB1
Legend
[1]
Ground
[2]
Main Power Switch
Summary of Contents for EDGE-2
Page 8: ...vi 3UH QVWDOODWLRQ XLGH...
Page 11: ...01_20ed3aSafety fm 3UH QVWDOODWLRQ XLGH 1 11 Installation Safety Instructions 1 25...
Page 12: ...3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 34: ...1 22 3UH QVWDOODWLRQ XLGH FIGURE 1 4 OILMATIC SAFETY LABELS...
Page 38: ...1 26 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 63: ...02_20ed3a Specifications fm 2 23 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 64: ...2 24 3UH QVWDOODWLRQ XLGH...
Page 74: ...3 8 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 79: ...04_20ed3a Pre Delivery Prep fm 4 3 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 87: ...04_20ed3a Pre Delivery Prep fm 4 11 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 88: ...4 12 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 103: ...05_20ed3a Machine Delivery fm 5 13 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 104: ...5 14 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 112: ...SSHQGL A 6 NOTES SKETCHES...
Page 120: ...SSHQGL A 14 NOTES SKETCHES...