03_20ed3a Install Process.fm
3 - 3
3UH,QVWDOODWLRQ*XLGH
('*(
3.2.2
FSE Installation and Set-up Duties
The Makino FSE is responsible for installing the machine and training your
personnel. The FSE installation process should be completed in five work-
ing days.
These duties have a logical order and a built-in flexibility allowing the FSE
to work around unexpected delays or problems and still complete the
installation on time. The following steps may be completed in a different
order.
•
Some tasks duplicate items you already performed. This confirmation
reduces the chance of error or accident.
3.2.2.1
Machine Installation
1. Initial Checks
-
Check the foundation and placement.
-
Check the machine for damage or other unacceptable conditions.
-
Confirm cleanliness of machine components (i.e. anti-corrosive
grease is removed). After start up the FSE assists in final cleaning.
-
Verify receipt of all accessories.
2. Remove Shipping Locks
-
Remove all axes and other component shipping locks and supports.
You keep all locking and support devices in case the machine
needs to be moved.
-
Check all motor connections.
3. Power, Air, and Lubrication
-
Verify source voltage, transformer connections, and tap settings.
-
Confirm air is supplied at the proper pressure and volume.
-
Supervise filling of reservoirs with the proper fluids.
4. Machine Set-up
-
Verify machine level and correct, if needed.
-
Connect peripheral devices (i.e. Oilmatic).
-
Install unit anchors, if needed.
Summary of Contents for EDGE-2
Page 8: ...vi 3UH QVWDOODWLRQ XLGH...
Page 11: ...01_20ed3aSafety fm 3UH QVWDOODWLRQ XLGH 1 11 Installation Safety Instructions 1 25...
Page 12: ...3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 34: ...1 22 3UH QVWDOODWLRQ XLGH FIGURE 1 4 OILMATIC SAFETY LABELS...
Page 38: ...1 26 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 63: ...02_20ed3a Specifications fm 2 23 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 64: ...2 24 3UH QVWDOODWLRQ XLGH...
Page 74: ...3 8 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 79: ...04_20ed3a Pre Delivery Prep fm 4 3 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 87: ...04_20ed3a Pre Delivery Prep fm 4 11 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 88: ...4 12 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 103: ...05_20ed3a Machine Delivery fm 5 13 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 104: ...5 14 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 112: ...SSHQGL A 6 NOTES SKETCHES...
Page 120: ...SSHQGL A 14 NOTES SKETCHES...