5 - 4
('*(
3UH,QVWDOODWLRQ*XLGH
5.3.1
Lifting and Moving the Machine
1. Verify the machine moving
members - X and Y axes and
ATC are securely retained by
the yellow or orange painted
shipping locks (
A. Y axis shipping lock is
located on the left behind
access plate [2].
B. X axis shipping lock is
located on the back
behind access plate [1].
C. ATC shipping lock is
viewed from the front.
2. Attach the lifting fixture to an
overhead crane (
and center it over the
machine
3. Place the cable loops over
the lifting bars, as shown in
.
4. Slowly raise the crane hook
to remove slack in the
cables, checking for interference with machine components. Use
heavy pads or wood blocks at interference points. .
5. Lift the machine and move to installation site.
6. Set 300mm blocking under the machine, near each leveling point.
Lifting and Moving Hazard
When lifting or moving the machine:
1. Make sure machine is balanced. Keep the machine level and lift or move gently.
2. Lift no higher than needed. Keep all body parts from under the machine.
3. Prevent impact with any nearby objects.
4. Do Not remove axis locks or move any axis. Axis locks will be removed by the FSE.
F
IGURE
5-1
SHIPPING
LOCKS
Legend
[1]
X Axis Shipping Lock
[2]
Y Axis Shipping Lock
[3]
ATC Shipping Lock
Rigging Detail
Makino machines are designed to be lifted by overhead crane. The required rigging is
shipped with the machine. If using a fork lift BE SURE to approach from the machine
side (Not the NC side).
Summary of Contents for EDGE-2
Page 8: ...vi 3UH QVWDOODWLRQ XLGH...
Page 11: ...01_20ed3aSafety fm 3UH QVWDOODWLRQ XLGH 1 11 Installation Safety Instructions 1 25...
Page 12: ...3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 34: ...1 22 3UH QVWDOODWLRQ XLGH FIGURE 1 4 OILMATIC SAFETY LABELS...
Page 38: ...1 26 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 63: ...02_20ed3a Specifications fm 2 23 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 64: ...2 24 3UH QVWDOODWLRQ XLGH...
Page 74: ...3 8 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 79: ...04_20ed3a Pre Delivery Prep fm 4 3 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 87: ...04_20ed3a Pre Delivery Prep fm 4 11 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 88: ...4 12 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 103: ...05_20ed3a Machine Delivery fm 5 13 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 104: ...5 14 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 112: ...SSHQGL A 6 NOTES SKETCHES...
Page 120: ...SSHQGL A 14 NOTES SKETCHES...