05_20ed3a Machine Delivery.fm
5 - 5
3UH,QVWDOODWLRQ*XLGH
('*(
7. Lower the machine onto blocking and install the NC unit leveling feet
into the bottom of the cabinet. Run the leveling feet up to within 5mm
of cabinet.
-
Leveling feeet and machine leveling pads are shipped in the acces-
sories crate or attached to the machine pallet.
8. Lilft the machine and remove blocking.
9. Set the machine on the leveling bases.
10. Unhook the cables and move the crane away from the machine.
11. Rough level the machine.
Setting and Leveling Bases
1. When setting the machine, even temporarily, place leveling bases under the
machine to prevent casting distortion.
2. If machine will sit for longer than 12 hours prior to its final setting, rough level the
machine to 0.03mm/m (see
).
0$.,12
F
IGURE
5-2
RIGGING
AND
LIFTING
DETAIL
Summary of Contents for EDGE-2
Page 8: ...vi 3UH QVWDOODWLRQ XLGH...
Page 11: ...01_20ed3aSafety fm 3UH QVWDOODWLRQ XLGH 1 11 Installation Safety Instructions 1 25...
Page 12: ...3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 34: ...1 22 3UH QVWDOODWLRQ XLGH FIGURE 1 4 OILMATIC SAFETY LABELS...
Page 38: ...1 26 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 63: ...02_20ed3a Specifications fm 2 23 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 64: ...2 24 3UH QVWDOODWLRQ XLGH...
Page 74: ...3 8 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 79: ...04_20ed3a Pre Delivery Prep fm 4 3 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 87: ...04_20ed3a Pre Delivery Prep fm 4 11 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 88: ...4 12 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 103: ...05_20ed3a Machine Delivery fm 5 13 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 104: ...5 14 3UH QVWDOODWLRQ XLGH NOTES SKETCHES...
Page 112: ...SSHQGL A 6 NOTES SKETCHES...
Page 120: ...SSHQGL A 14 NOTES SKETCHES...