background image

Max. Output(W)

Battery

Voltage: V

Cell and Capacity

Capacity
        : mm ( " )

Charging Time

330

0 - 1,100

0 - 4,000

18

Li-ion  3.0 Ah

Yes

Yes

Yes

Yes
Yes

Yes

Yes

10  (3/8)

13  (1/2)

26  (1-1/16)

18  (11/16)

3.0  (6.6) including Battery BL1830 

approx. 22 min. with DC18RA

Models No.

 Description

PRODUCT

T

ECHNICAL INFORMATION

C

ONCEPT AND MAIN APPLICATIONS

 

S

pecification

S

tandard equipment

O

ptional accessories

Note: The standard equipment for the tool shown above may differ by country.

P 1 / 14

BHR240

Cordless Rotary Hammer

Dimensions: mm (")

Width (W)

Height (H)

Length (L)

410 (16-1/8) 

78 (3-1/16) 

206 (8-1/8) 

W

H

L

Bit Shank

Chuck Capacity: mm ( " )

SDS plus

Steel

Wood

* Concrete

* Concrete: 24 (7/8) 
        for North American Countries

Blows per min, :(bpm=min 

-1)

No load speed : (min 

-1

= rpm)

Variable switch

Reverse switch
Clutch (Torque Limiter)

Electric Brake
Net Weight : kg (lbs)

* Grip Assembly ...................................   1 set       * Depth Gauge (Stopper Pole) ..............  1 pc.

* SDS-Plus bits
* Taper shank T.C.T bits
* Taper shank adapter
* Cotter
* Drill chuck assembly
* Chuck adapter
* Drill chuck S13

* Bull points
* Dust Cup
* Grease Vessel 30g
* Blow out bulb
* Safety goggle
* Dust extractor attachment
* Joint 25

* Charger DC18RA
* Charger DC18SC
* Charger DC24SA
* Charger DC24SC
* Battery BL1830

Rotation

Hammering

Ro Hammering

Working
mode

These new products will be available in the following variations.

The cordless version of HR2453/HR2454 has been launched
with D-handle for operator's comfort.

The variations for USA, Canada, Mexico and Panama are as follows.

BHR240SFE

BHR240SF

BL1830

DC18RA

Model No.

Type

Quantity

Charger

Plastic

carrying case

Yes

Yes

No

No

No

2

1

---

Battery

BHR240

BHR240Z

BHR240Z

BL1830

DC18RA

Model No.

Type

Quantity

Charger

Plastic

carrying case

Yes

No

No

No

2

---

Battery

* Chuck key S13
* Keyless drill chuck
* Grip assembly
* Scraper Assembly
* Cold chisels
* Grooving chisels
* Scaling chisels

Summary of Contents for BHR240

Page 1: ...e Net Weight kg lbs Grip Assembly 1 set Depth Gauge Stopper Pole 1 pc SDS Plus bits Taper shank T C T bits Taper shank adapter Cotter Drill chuck assembly Chuck adapter Drill chuck S13 Bull points Dus...

Page 2: ...rmature holder 32 Fixing Tool holder Removing installing Ring spring 19 for modular use with 1R003 1R212 Tip for retaining ring pliers Installing Oil seal 25 1R232 Pipe 30 Removing Oil seal 25 1R252 R...

Page 3: ...older comp 28 X ring 9 Inner circumference Surface that contacts Tool holder comp 32 Sleeve 9 31 Ring 10 Surface that contacts Cushion ring 13 Whole surface 38 O ring 9 35 Whole surface 41 O ring 16 P...

Page 4: ...washer and Conical compression spring 21 29 Fig 5 ASSEMBLING Do the reverse of the disassembling steps Note Conical compression spring 21 29 and Ring spring 19 are not reversible when assembled to To...

Page 5: ...lace the provisionally assembled Change lever within the area A of Gear housing Fig 8 and insert into the Change lever installation hole Change lever cannot be inserted completely in this step 4 Pushi...

Page 6: ...ction Figs 3 4 5 in page 4 and Change lever Figs 7 8 2 Separate Gear housing from Motor housing Fig 12 Remove Armature from Gear housing Fig 13 3 Remove the assembly of Tool holder section and Inner h...

Page 7: ...trated in Fig 17 3 Clamp Tool holder complete using Vise and 1R038 as illustrated in Fig 18 4 Insert a slotted screwdriver between Ring spring 28 and O ring case through the side hole of Tool holder I...

Page 8: ...g 22 3 6 Swash Bearing Section DISASSEMBLING Impact bolt section X ring 9 O ring 16 Ring 10 O ring 9 Sleeve 9 Impact bolt Cushion ring 13 O ring case Fig 23 Piston cylinder as an assembling jig Note N...

Page 9: ...he rear dead center position Inner housing Swash bearing section Fig 28 Fig 29 Fig 30 6 Remove Ball bearing 606ZZ from Gear housing complete using the removed Swash bearing section as a jig as follows...

Page 10: ...ASSEMBLING 1 Assemble Swash bearing section using 1R034 as illustrated in Fig 33 Note 1 Be sure to put Flat washer 8 in place or Bearing retainer will be clamped between Ball bearing 608ZZ and Helica...

Page 11: ...ig 38 assemble Change plate to Inner housing and Clutch cam to Cam shaft at the same time Put Spur gear 10 and Compression spring 7 through Cam shaft and secure them with Retaining ring S 7 Put Compre...

Page 12: ...5 Face 34mm side to Oil seal 25 in Gear housing complete 1R164 Gear Housing Complete 1 Pass F R change lever s tab through switch cover left in Fig 42 2 Mount switch cover to switch by fitting the pro...

Page 13: ...Circuit diagram P 13 14 Yoke Unit Heat Sink F E T Terminal End bell Complete Color index of lead wires sheath Black Red Blue Fig D 1 Yellow Switch Tape to bundle the lead wires...

Page 14: ...following lead wires with band FET s lead wires black blue yellow Switch s lead wire red Rib A FET Rib C Route he following lead wire between rib B and rib C Switch s lead wires black and red FET s l...

Reviews: