W
iring diagram
P 14 / 14
Terminal M2
Route End bell's lead wires
(black) and (red) between
boss and rib A.
Fix the End bell's lead wires
(black and red) with lead
wire holder.
Connecting terminal of M2 side
can be inflected toward the direction
designated with arrow in order to
avoid pinching of lead wire,
if it is necessary.
Bundle the following lead wires
with band.
* FET's lead wires (black) (blue)
(yellow)
* Switch's lead wire (red)
Rib A
FET
Rib C
Route he following lead wire between rib B and rib C.
* Switch's lead wires (black and red)
* FET's lead wires (black, blue, yellow)
Rib B
Boss
Fix the FET's lead wires (black,
blue and yellow) with lead wire
holder.
Heat Sink
Terminal
Endbell Comp.
Switch
The flag connector has to be so connected,
that its wire connecting portion is located over
the mark of + - poles.
Flag Connector
Terminal
Wire Connecting Portion
Mark of Poles
Fig. D-2