background image

W

iring diagram

Fig. D-3

Wiring of LED Lead Wires   (before setting Switch)

Wiring in Housing set (L) (after setting Switch)

LED

Rib A

Rib B

Rib D

Lead wire holder A

Connectors in 

Connector box B

Connectors can be also routed

through Connector box B. 

In this case, Lead wires 

have to be secured with Lead

wire holder B.

Note for Wiring

:

If Line filter interferes with Housing set (R)

in assembling, check that Insulated terminal 

is tilted enough to save the space for Line 

filter referring to 

Fig. D-2

.

Rib C

Connectors in Connector Box A

Lead wire

holder B

Rib F

LED

Boss

Rib E

Switch

Line filter

Route Lead wires connected to Switch

between Boss and the inner wall of 

Housing set (L).

BTW073, BTW103

(without Automatic Impact Stop System)

Route Lead wires (black, red) between 

Rib A and the inner wall of Housing set (L).

Route lead wires (black, red) between Rib A 

and Rib B so that they are not pinched

with Switch.

If Connectors are put in Connector box A, route

Lead wires (black, red) through Connector box A

and secure them with Lead wire holder A .

Route Lead wires (black, red) between Rib B

and the inner wall of Housing set (L).

Be careful not to route 

any Lead wires on this Rib.

Place Line filter between Rib E and Rib F.

P  1

2

/ 1

5

Summary of Contents for BTW074

Page 1: ...ge 6 Capacity Ah Cell Voltage V 14 4 0 2 500 0 2 700 0 3 500 65 660 575 4 95 970 841 5 Standard bolt High tensile bolt Driving shank M5 M12 3 16 1 2 M5 M10 3 16 3 8 Yes Yes Yes Yes Yes Yes Electric br...

Page 2: ...tions designated with the black triangle to protect parts and product from unusual abrasion Item No Description Anvil Drum portion which is accepted by Needle bearing 1412 mounted in Hammer case compl...

Page 3: ...pression spring and Switch plate complete or Cover complete as shown in Fig 2 Model No Max fastening torque Distinctive Parts BTW073 BTW074 BTW103 BTW104 65 N m 95 N m BTD063 Cover complete white BTD0...

Page 4: ...f Torsion spring 2 Take out Carbon brushes Then disassemble Armature and Yoke unit from Brush holder 1 Loosen four M4x22 Pan head screws and separate Hammer case complete from Housing set 2 Loosen two...

Page 5: ...end of Armature into Internal gear case And insert the commutator end of Armature into Brush holder Internal gear case Yoke unit Brush holder Fig 5 Armature Yoke unit Internal gear case Motor section...

Page 6: ...tails and Spacers as drawn in Fig 9 2 Assemble Switch with F R change lever to Housing set L Prong portion of F R change lever Projection of Switch Pig tails Note Make sure that the loosening of Pig t...

Page 7: ...Internal gear case as drawn in Fig 3 2 Remove Internal gear case from Armature as drawn on the left in Fig 5 3 Remove Ball bearing 6801LLB from Internal gear case as drawn in Fig 11 Tap Internal gear...

Page 8: ...ssembled easily set Hammer case complete on 1R232 Refer to the drawing on the left in Fig 12 3 Assemble Ring spring 7 as drawn in Fig 14 Anvil and Nylon washer 14 are removed from Hammer case complete...

Page 9: ...shown below in Fig 16R and then release it from 1R045 Caution Do not hold Hammer section as shown below in Fig 16F when releasing Hammer section from 1R045 Failure to follow this instruction could cau...

Page 10: ...mbly procedure Refer to Fig 17 Note for Assembling Before putting Flat washer 24 in Hammer make sure that twenty four Steel balls 3 5 are put in the groove of Hammer as shown in Fig 18 There will appe...

Page 11: ...to M2 Terminal of Switch Viewed from Housing set L side Viewed from Housing set R side Viewed from Rear side M1 M1 M2 M1 30 5 M2 BTW073 BTW103 without Automatic Impact Stop System BTW073 BTW103 witho...

Page 12: ...ors in Connector Box A Lead wire holder B Rib F LED Boss Rib E Switch Line filter Route Lead wires connected to Switch between Boss and the inner wall of Housing set L BTW073 BTW103 without Automatic...

Page 13: ...of lead wires sheath Black Blue Red BTW074 BTW104 equipped with Automatic Impact Stop System Green Gray White Orange Wiring to M1 Terminal of Switch Wiring to M2 Terminal of Switch Viewed from Housing...

Page 14: ...e of Lead wires blue black red and gray between Rib A and the inner wall of Housing set L Route the bundle of Lead wires blue black red and gray between Rib B and the inner wall of Housing set L Route...

Page 15: ...set L Boss Be careful not to route any Lead wires on this Rib Route Lead wires of Impact finish indicator lamp between the Ribs Secure lead wires of both Connectors 6 pin with Lead wire holders Impac...

Reviews: