background image

P 1

0

/1

0

W

iring diagram

Switch

Brush holder complete

Lead wire holder

Lead wire holder

LED

pin

boss

Connector (large)

Connector (small)

Light circuit

rib

Terminal side

Switch side

Lead wire holder

Terminal

Fig. D-2

1. Lead Wires of LED 

2. Other Lead Wires 

Fix LED lead wires (red, black) with lead wire holder,
then route between pin and boss as illustrated below.

Assemble each Connecting
terminal to Switch at approx.
20 degrees to the vertical.

Fix the lead wires connected
to each connector with these
lead wire holders.

Put Light circuit in place
so that the orange lead wire 
faces toward the Terminal side.

Lead wire
(orange)

20 degrees

Do not cross LED lead wires (red, black) here.

LED

Fit the corner of LED against the corner
of Housing (L) as illustrated below.

Do not slack LED lead wires
(red, black) in this area.

Put the following lead wires
between the rib and Light circuit.
* Lead wires (red, black) from
   Terminal to Connector (small)
* Lead wire (blue) from Switch
   to Connector (small)

Pin

The lead wire (blue) from
Connector to Switch has to
be routed inside of this pin.

Summary of Contents for BTW152

Page 1: ...Battery BL1430 Fast charger DC18RA Charger DC18SD Charger DC24SC Catalog value torque at 6 seconds after seating when fastening M16 high tensile bolt Weight according to EPTA Procedure 01 2003 with Ba...

Page 2: ...s 134848 9 Socket 32 50 2 pcs Disassembling Hammer case complete Apply Makita grease N No 2 and FA No 2 to the portions designated with black and gray triangles to protect parts and product from unusu...

Page 3: ...cover Separate Hammer case section together with Motor section from Housing L then pull off Motor section from Hammer case section Fix Hex socket 32 50 134848 9 firmly in vise then set Hammer section...

Page 4: ...ection can now be disassembled as illustrated to right in Fig 4 Fig 4 1R223 1R224 Hex socket 32 50 Hex socket 32 50 Bearing box complete Hammer case complete Hammer section Internal gear 51 O Ring 40...

Page 5: ...o 40 N m Bearing box complete Internal gear 51 Hammer case complete Aligning the 4 locking grooves on the inside surface of Hammer case complete with the four locking projections of Internal gear 51 s...

Page 6: ...of the torsion spring 2 Disconnect Carbon brush from the commutator by pulling it in the direction designated with the arrow 3 Pull off Armature and Yoke unit from Brush holder complete Yoke unit Arma...

Page 7: ...ake sure that Brush holder comp Yoke unit Hammer case comp are placed on Housing L as illustrated in Fig 11 6 Connect Carbon brushes to Armature s commutator then assemble Housing R to Housing L When...

Page 8: ...Steel ball insertion Steel ball 5 6 2pcs Fig 12 2 Hold Hammer section as illustrated in Fig R and release it from the Gear extractor Note Do not hold gear extractor as illustrated in Fig F when relea...

Page 9: ...MBLING Assemble F R change lever to Switch and Housing as illustrated in Fig 17 Fig 17 Housing L F R change lever Switch pin of Switch prong portion of F R change lever Fit the pin of Switch into the...

Page 10: ...e vertical Fix the lead wires connected to each connector with these lead wire holders Put Light circuit in place so that the orange lead wire faces toward the Terminal side Lead wire orange 20 degree...

Reviews: