18
7.STARTING UP AND USING
B
oiler start up must only be done by MAKTEK AUTHORIZED SERVICE.
7.1 INITIAL OPERATION
At first start-up, the system water must be completely filled and air must be
purged from system. The system water pressure should be 1.5 bar on the
manometer at the front panel.
Pellet should be filled in the fuel tank up to 15 cm level to top cover. The first
fuel filling (preloading) to the combustion chamber should only be carried out
by Maktek Authorized Services. This process is only done once before the first
start. Since the fuel level in the fuel tank is controlled by the electronic
sensor, this operation is unnecessary when the fuel is exhausted and while
the boiler is being used
To activate the boiler press and hold the on-off button on the control panel
until the LCD screen opens.
The fuel loading and burning process will be
done automatically.During the ignition, the temperature and auto setting
indications will flash interchangeably on the LCD screen.
When the combustion occurs, the burning symbol appears on the screen
and the boiler continues to run automatically at the factory settings.
Factory settings are recommended as user settings and are given in the
table below. The automatic operating parameters can be changed by the
user by taking into account the isolation condition of the building or the
type of pellet used.
The desired boiler water temperature is set by the user with the
temperature setting button hence the automatic operation of the
boiler is provided.
If optional room thermostat connection is available, the user can control the
boiler by adjusting the desired room temperature via the room thermostat.
When the boiler water temperature (room temperature when room
thermostat is used) reaches the level that the user has set, the boiler stops
burning and is put on hold. When the set temperature drops below 3 ° C
from the set temperature, the boiler automatically provides burning and
operates at user settings.
Summary of Contents for 25MKP
Page 1: ...1...
Page 7: ...7 3 APPEARANCE OF THE BOILER AND EXTERNAL DIMENSIONS...
Page 11: ...11 4 2 BOILER INSTALLATION MOUNTING SCHEMA 1 1...
Page 16: ...16 When no setting is done the value shown at the screen is the boiler water temperature...
Page 19: ...19 USING SETTING RECOMMENDED BY THE FACTORY FAN LEVEL 3 LOADING 9 sec WAITING 29 sec...
Page 28: ...28...