22
8
.
CLEANING AND MAINTENANCE INSTRUCTIONS
In order to use your boiler safely for a long period of time, please pay attention to
below mentioned rules of cleaning and maintainence.
Pellets in suitable standarts like 6-8 mm in diameter, 6-30 mm in length, made of
wood with shells peeled, moisture content 10% -15%, minimum 3500-4000 kcal
heat value, no chemicals and additives added should be used in the boiler
Pellets made of chipboard and MDF powder should never be used in the boiler.
The ash drawer of the boiler should be cleaned when it is full.
In order to obtain high efficiency from your boiler, you must use high
quality, high calorie, dry fuel.
To clean the smoke pipe,clean the helezones by shaking them by moving the
cleaning arm on the left side of the boiler about 10 times up and down once a
day. In this way, smoke pipe blockages with combustion wastes are
prevented.
The air vents in the combustion chamber and the combustion chamber are
automatically cleaned with the fan. If any deterioration observes in the
combustion, combustion chamber can be cleaned by inserting a hard material
with appropriate diameter in its holes.
Cut the electricity connections before the maintenance of the boiler.
Ventilate the air in the place while cleaning the boiler.
Before the winter season, make the maintainence o the electrical, chimney
and plumbing connections of the boiler.Check boiler water pressure
regularly.
(Ideal working pressure 1.5bar)
We recommend that the periodic maintenance of the boiler must be
done by our authorized services.
9.SUGGESTIONS FOR ECONOMIC USE
-For proper ventilation, windows should be completely opened for a short time and
radiator valves should be turned off at the same time.
- Pay attention not to heat up the place too much: room temprature must be kept at 20
degrees.Keeping room temperature 1 degree less makes a 6% economy on heating costs.
-When the weather gets dark, close the shutters if any.
Summary of Contents for 25MKP
Page 1: ...1...
Page 7: ...7 3 APPEARANCE OF THE BOILER AND EXTERNAL DIMENSIONS...
Page 11: ...11 4 2 BOILER INSTALLATION MOUNTING SCHEMA 1 1...
Page 16: ...16 When no setting is done the value shown at the screen is the boiler water temperature...
Page 19: ...19 USING SETTING RECOMMENDED BY THE FACTORY FAN LEVEL 3 LOADING 9 sec WAITING 29 sec...
Page 28: ...28...