9
4.BOILER MOUNTING
•
Boiler should be mounted in balance and mounted on a 10cm higher
platform at the boiler room.
•
Boiler should be connected to a well draught chimney and minimum
number of elbows should be used between chimney and boiler.
•
The boiler must be located at a place where it can get enough air for efficient
combustion.
MAKTEK MKP series boilers are produced with closed expansion
tank and 3 bar safety valve on the device. It is recommended that an additional
safety valve should be installed on device to meet the expansions in the
installation
•
Pipes
must be cleaned before the initial operation of the boiler.
The best
way is to flood water from one side of the pipes and drain it from the other
side.
•
The circulation pump should be mounted on the return pipe of the boiler water.
•
During mounting, there should be adequate space left for service
intervention, device control and fuel loading
•
Valve connection should be made on the boiler water return lines.
•
The chimney connections must be leakproof. The chimney connection pipes
of the device must be used at the same diameter without any section narrowing
from the device outlet to the chimney hole.
•
Grounding connections of the device should be done, e
lectrical connection
of the circulation pump must be done correctly. Only authorized service
must be called at all electrical faults.
Summary of Contents for 25MKP
Page 1: ...1...
Page 7: ...7 3 APPEARANCE OF THE BOILER AND EXTERNAL DIMENSIONS...
Page 11: ...11 4 2 BOILER INSTALLATION MOUNTING SCHEMA 1 1...
Page 16: ...16 When no setting is done the value shown at the screen is the boiler water temperature...
Page 19: ...19 USING SETTING RECOMMENDED BY THE FACTORY FAN LEVEL 3 LOADING 9 sec WAITING 29 sec...
Page 28: ...28...