2. FEATURES OF THE BOILER

Our boilers are designed to be used for comfortable heating and domestic hot water in residental 
areas, work places and offices.

It is easy to use the boiler thanks to digital control panel. The outer case of the boiler is 

designed for easy   demounting enabling installation and service ease.

Thanks to wide loading and disposal doors, fuel feeding,ignition and ash cleansing is easily 
done.

If proper chimney is selected,thanks to three pass pipes, chimney draught related problems are 

not seen.

Thanks to three pass  parallel pipes, the efficiency of the boiler is high. Set temprature is
quickly achieved.

Thanks to fan which can be adjusted with digital thermostat, the air is homogenously distributed 
inside the boiler, enabling a full and stable burning.

Thanks to digital thermostat fan, the boiler reaches a natural burning after a certain period.

The chimney temprature drops, enabling a higher efficency.

The pump cable is extended outside the boilers body for connection.

The moving grills are designed for easy demounting with long life

Ash disposal system enables a care free cleansing to large volume ash tray.

The clap in front of the fan closes air inlet by 90% when the boiler reaches adjusted 

temprature, thus enabling control of burning and temprature.

Thanks to limit thermostat ,electricity is cut out if the boiler temprature exceeds 90 degrees.
The boiler is perfectly isolated against heat losses and the heat moving down are absorbed 

thanks to the grill.
 Boiler cleaning is easily done thanks to special inner design of the  boiler.Special sheet metal is 
used in burning pot enabling durability and long life.
Our boilers are designed to be used at 3 bars working pressure. Each boiler is tested with 5 bars 

pressure using hydrostatic pressure test and produced in conformity with CE standarts

The economic life cycle of the boiler is estimated to be 15 years.

Summary of Contents for MKK Series

Page 1: ......

Page 2: ...FLOOD 9 BOILER INSTALLATION SCHEMA 10 4 2 AIR CONNECTION 10 4 3 CHIMNEY 11 CHIMNEY CONNECTION SCHEMA 12 FEATURES OF THE FUEL 13 5 TECHNICAL FUTURES 14 6 CONTROL PANEL 15 7 FIRST OPERATION AND USE 17...

Page 3: ...ictly forbidden Please do not operate the boiler without water Do not feed cold water to hot boiler If for any reason the boiler temprature is over 90 degrees do not attempt to feed cold water to the...

Page 4: ...after a certain period The chimney temprature drops enabling a higher efficency The pump cable is extended outside the boilers body for connection The moving grills are designed for easy demounting w...

Page 5: ...3 SECTIONS OF THE BOILER...

Page 6: ...periodic cleaning this lid is opened to enable cleaning of the smoke pipes with boiler brush 3 Loading lid The loading of fuel to boiler is done from this lid 4 Disposal lid This is the lid that enabl...

Page 7: ...supply fresh air to the installation site air ducts is a necessity to avoid the formation of poisonous gases The boiler must be installed in a secure location unaffected by weather conditions This wi...

Page 8: ...water must be provided by natural circulation The diameter of the pipe to be used at by pass line should be the same diameter size with the pipe used in installation at minimum As an extra security m...

Page 9: ...al h 40 lt 25 MKK 25 000 kcal h 50 lt 40 MKK 40 000 kcal h 75 lt 60 MKK 60 000 kcal h 100 lt 80 MKK 80 000 kcal h 200 lt 100 MKK 100 000 kcal h 250 lt 150 MKK 150 000 kcal h 300 lt 200 MKK 200 000 kca...

Page 10: ...al length must not be shorter than 60 cm and longer than 2 meters and pipe must be connected to the chimney with minimum 10 degree of angle We suggest not to use enamel stove pipes as it creates tar i...

Page 11: ...ilding if the chimney must pass from outside the isolation must be done properly The chimney must be frequently cleaned in order to avoid tar and soot and clogs Please avoid foreign objects cement or...

Page 12: ...ll the smoke pipes of the boiler in short time causing a dramatic decrease on capacity and efficiency of the boiler Please pay special attention to specification of fuel NOTE In order to determine the...

Page 13: ...5 825 950 1215 1620 1750 2130 w1 180 180 250 250 250 250 250 290 220 220 w2 250 250 250 250 250 250 310 310 310 310 D 130 130 160 160 160 180 250 250 350 350 Circulation Flow Return 1 1 1 1 4 1 1 2 1...

Page 14: ...6 CONTROL PANEL...

Page 15: ...s Fan Cycle Increase Button Increases fan speed from 1 to 5 Fan Cycle Decrease Button Decreases fan speed from 1 to 5 Fan Led Indicates that the fan is functioning properly Pump Led Indicates that the...

Page 16: ...fan must be cancelled until the problem is fixed Gas draught of the chimney must be high A simple way to detect this is to cover the entrance of the chimney with a news paper and see if the paper han...

Page 17: ...the sytem water temprature reaches to set values on control thermostat At this value the fan will stop and the circulation pump continues to function In this case you can see what temprature is the b...

Page 18: ...pump might get damaged ATTENTION In case of an electricty cut and when the circulation pump is not functioning the boiler water can reach to a boiling degree since heat transfer will not be done In t...

Page 19: ...aning lid at the back smoke case and clean inside of the smoke case Make sure that it fits properly during remount Close the cleaning lid and turn off moving grill in order to restart the boiler Chimn...

Page 20: ...9 ELECTRIC SCHEME...

Page 21: ...Decrease draught by reinforcement The fan does not stop when it reaches to thermostat value Thermostat is broken Thermostat must be replaced There is tar and soot inside the boiler and chimney Low qua...

Page 22: ...e use of the supporting ring When the boiler lifted up with crane there shouldn t any living being under the boiler Boiler must be carried with its accessories installed on it B CARRYING BOILER ON VEH...

Page 23: ......

Reviews: