Section C – Unit Installation 

 
The cabinet must be installed level on adjustable legs. 
 

Service Connections 

 
Provide 98mm OD duct to atmosphere. 
 
Electrical Connection – 240 Volt 15 Amp cycle. 
 
Plug into 15 Amp G.P.O. 
 

Wall Recessed Units 

 
Plug into standard 240 Volt outlet. - Plug shall be accessible after installation. 
 
Outside dimensions pass through – 1850h x 755w x 690d. 

 

Cabinet clearance space dimension (eg at least 150mm per side and 500 mm on top) are to be 
provided for the appliance. 
 
Drying cabinet sides are to fit through the wall cavity ensuring that the power cord and filter are not 
obstructed.  Placement should be typically 150mm from the operating panel side doors.  There is 
to be a 5 to10mm gap between the side panel and the timber. 
 
Clearance on the top of the Drying Cabinet needs to be typically 500mm.  This allows access to 
replace the electric motor, heating elements etc.  Allowing for this 500mm may require the facility 
to install a false panel in the dividing wall. 
 
All electrical service work must be accessible through the top of unit. 
 
Position the unit in cavity, assuring that doors can be open and shut in corner manner. 
 
 

NOTE: 

This appliance is not intended for use by persons (including children) with reduced physical, 
sensory, or mental capabilities, or lack of experience and knowledge, unless they have 
been given supervision or instruction concerning use of the appliance by a person 
responsible for their safety. Children should be supervised to ensure they do not play with 
the appliance. 

 

If the supply cord is damaged, it must be replaced by the manufacturer or its service agent 
or a similarly qualified person in order to avoid a hazard. 

 

 

 
 
 
 
 
 

Summary of Contents for Drying Cabinet

Page 1: ......

Page 2: ...of Contents Forward 3 Design Parameters 3 Quality Policy 4 Section A Unit Operation 5 Section B Unit Maintenance 6 Trouble Shooting Guide 7 Wiring Diagram 8 Section C Unit Installation 9 Unit Specific...

Page 3: ...r tubing face masks anaesthetic bags and other ancillary equipment A total of six 6 stainless steel shelves is provided The shelves are removable with 6 positions including the base The cabinet is ins...

Page 4: ......

Page 5: ...net appears for approximately five seconds After five seconds the unit switches to display the actual cabinet temperature Changing the set temperature lock out feature AUTHORISED PERSONNEL ONLY Author...

Page 6: ...m water and detergent Wipe over outside panels with stainless steel cleaner Weekly Remove filter on air intake top right hand side panel and wash in warm water and replace when dry Half Yearly Check e...

Page 7: ...turns off Fan failure Switch off power supply at main and Call for Service Display is on but unit not heating Element failure Relay board failure Switch off power supply at main and Call for Service...

Page 8: ...Drying Cabinet Operation Maintenance and Installation Manual Issue 15 Page 8 7th October 2011 Wiring Diagram...

Page 9: ...be a 5 to10mm gap between the side panel and the timber Clearance on the top of the Drying Cabinet needs to be typically 500mm This allows access to replace the electric motor heating elements etc All...

Page 10: ...B SKCM325 Access via compatible RS232 Control PCB Overtemp Protection Electronic cutout 5 C above set point Temperature Control Incremental 1 C 70 C Factory set at 70 C Secondary Overtemp Protection H...

Page 11: ...ltered Parts damaged in transit back to Malmet Leeton due to poor packaging could result in warranty claim being rejected Any part tampered with or has unauthorised repairs and modifications will be r...

Page 12: ...tial loss either direct or indirect resulting from power spikes incorrect operation incorrect installation or faulty product are excluded All warranties are NOT transferable Unauthorised use of non ge...

Page 13: ...installer is responsible for the correct installation start up and demonstrating the operation of this product They are also responsible for issuing the relevant certificates of compliance These may...

Page 14: ......

Reviews: