background image

Assessment:

Check fall victim for consciousness. (Worker 

must verbally respond and be uninjured and 

able to climb. If worker is injured or unconscious 

a trained rescue response team must perform 

rescue and use proper equipment.) If worker is 

conscious, know how and where the ladder will 

be deployed. 

Step 1

Step 2

WORK SURFACE

WORK SURFACE

Anchoring:

If anchor is damaged use the nearest anchor that 

allows the ladder to be within close proximity of 

victim after deployed.

Warning: Anchor or anchoring 

location must be able to support 

5,000-lbf or (22kN). Only use an 

approved ANSI Z359.1 anchorage.

*Rescuer must follow all personal 

fall protection guidelines per their 

governing body.

Summary of Contents for R0001

Page 1: ...L INSTRUCTIONS FAILURE TO DO SO MAY RESULT IN SERIOUS INJURY OR DEATH USERS SHOULD BE FAMILIAR WITH PERTINENT REGULATIONS GOVERNING THIS EQUIPMENT ALL INDIVIDUALS WHO USE THIS PRODUCT MUST BE PROPERLY...

Page 2: ...planned including all components calculating fall clearance and swing fall before using 8 A rescue plan and the means at hand to implement it must be in place that provides the prompt rescue of users...

Page 3: ...48m 1ft 305mm Rung to Rung Rope Grab Webbing Ladder Rope Victim Connecting Carabiner Deployment Bag Static 11 5mm Kernmantle Rope with sewn eye ANSI Z359 12 Steel Locking Carabiner DEPLOYED Deploymen...

Page 4: ...conscious know how and where the ladder will be deployed Step 1 Step 2 WORK SURFACE WORK SURFACE Anchoring If anchor is damaged use the nearest anchor that allows the ladder to be within close proxim...

Page 5: ...im to attach the rope end carabiner to the D ring of their harness Do not remove original fall protection restraint Once the fall victim is on the ladder rescuer must remove excess slack by pulling ro...

Page 6: ...e life of the product This should include but not be limited to long term storage with or without use Step 5 Marking Remove deployed tag from bottom rung of ladder and return all other components to d...

Page 7: ...Batch XXX XXX MFD MM YYYY Model R0001...

Page 8: ...scretion Malta Dynamics reserves the right to require that the defective item be returned to its plant for inspection before determining the appropriate course action Warranty does not cover equipment...

Reviews: