Transport
In case of transporting the components of the plant, it is necessary to make
sure that they are sufficiently protected and that a suitable means of
transport has been chosen with sufficient load capacity. The overall
measurements of the machine can be calculated from the technical data.
Any other means of transporting the
MALTECH
machine not envisaged by
the manual is absolutely forbidden.
The manufacturer is not responsible for possible damage due to transport
carried out by third parties in dispatching the plant.
The plant can be divided into its single elements for transport. However, the
electricity supply must be separated from the water supply.
Montage
Before mounting, it is necessary to prepare the area according to the
indications of the data in the present manual.
The machine has been conceived to be installed on a flat and stable
base. Any other type of position must be considered an inappropriate use
for which the manufacturer declines any responsibility.
To obtain sufficient stability, the
MALTECH
machine must not slope. Slopes
in the ground must be flattened out on the basis of the measurements
supplied so that they do not influence the stability of the machine
negatively!
The
MALTECH
machine must be fixed so that it cannot slide away.
Incorrect or unsatisfactory montage can cause damage to the machine or
to its singular parts and cause grave danger to people! To avoid this, the
operator must keep rigorously to the instructions contained in the use
manual for carrying out a correct montage.
The manufacturer declines any responsibility in the case in which
unauthorised personnel carry out the montage!
The danger of crushing exists during mounting and dismantling due to
lifting and lowering the components.
It is necessary to wear at least accident prevention shoes and
protective gloves during montage. It is necessary to wear a
protective helmet during the loading and unloading phase
whenever a crane is going to be used.
If a crane is used, nobody must stay within the range of action of
the crane’s arm.
The tension and the frequency of the supply cables must be tested before
connecting the
MALTECH
machine so that they conform to the technical
data of the plant.
Only technicians, on the basis of the data contained in the present use
manual, can carry out cabling the MALTECH machine.
Creating temporary solutions on the electrical plant is rigorously forbidden!
The supply and control cables, other than the water tubing, must be
installed without meeting possible obstacles and on the basis of the
technical data provided in the use manual.
All the protections requested must be worn at the end of the
montage and the first start-up of the plant!
www.markham-sheffield.co.uk - Tel: +44 (0) 1909 730861