background image

6

3

Silencio

TM

 Apartment Style Trolley Operator Installation

3.1

Assembly Instructions

 CAUTION

The operator has exposed moving parts and to prevent access to the pinch points, this operator must be installed

at least 8 feet (2,44 m) or more above the floor. Alternatively, covers or guarding, provided by the manufacturer,
must be installed when the operator is mounted less than 8 feet (2,44 m) above the floor.

NOTICE

Install the Silencio

TM

 operator only when all openings of a horizontal slide door are guarded or screened

from bottom of the door to a minimum of 4 ft (1,22 m) above the ground to prevent a 2-¼ in (57,2 mm)
diameter sphere from passing through the openings anywhere in the door.

For technical support, please call 

1-800-361-2260

 or visit 

www.manaras.com

 for more information

1

Attach tracks to Silencio operator

2

Assemble carriage

3

Slide carriage on track

Bolt 3/8-16

Nut 3/8-16

Lock washer  3/8

Lock washer  3/8

Take-Up Bolt 3/8-16

Nut 3/8-16

Nut 3/8-16

Carriage

Track

Operator Side

Summary of Contents for Silencio OTBH-A.06

Page 1: ...cy requirements For standard lift sectional doors with high cycling daily frequency requirements OTH A 06 OTBH A 06 OTH A 06 OTBH A 06 4 X Q U I E T E R READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS GIVE TO END USER Serial Model Wiring Diagram Project Name Door Name T h e S i l e n c i o T M o p e r a t o r s a r e 4 X Q U I E T E R t h a n o u r P r e mi u mT r o l l e y A p a r t me n...

Page 2: ...s OTH A 06 4 2 General Specifications and Dimensions OTBH A 06 5 3 SilencioTM Apartment Style Trolley Operator Installation 6 3 1 Assembly Instructions 6 3 2 Installation 8 Notes 10 Warranty 11 For technical support please call 1 800 361 2260 or visit www manaras com for more information ...

Page 3: ...6 Install the door operator at least 8 feet 2 44 m or more above the floor if the operator has exposed moving parts Covers or guarding provided by the manufacturer must be installed when the operator is mounted less than 8 feet 2 44 m above the floor 7 Do not connect the door operator to the source of power until instructed to do so 8 Locate the control station a within sight of the door b at a mi...

Page 4: ...onstant pressure to close APPLICATION Heavy duty for standard lift sectional doors with high cycling daily frequency requirements DUTY 100 cycles day Table 1 OTH A 06 Silencio TM Operator Selection Guide Maximum Area in Square Feet general guideline Sectional Doors HP Steel 18 ga ins Steel 18 ga 20 ga ins Wood Steel 20 ga 22 24 ga ins Alu Steel 22 24 ga Fiber Glass 196 245 314 343 392 270 319 441 ...

Page 5: ...ssure to close APPLICATION Heavy duty for standard lift sectional doors with high cycling daily frequency requirements DUTY 100 cycles day Table 2 OTBH A 06 Silencio TM Operator Selection Guide Maximum Area in Square Feet general guideline Sectional Doors HP Steel 18 ga ins Steel 18 ga 20 ga ins Wood Steel 20 ga 22 24 ga ins Alu Steel 22 24 ga Fiber Glass 196 245 314 343 392 270 319 441 490 549 1 ...

Page 6: ... the floor NOTICE Install the Silencio TM operator only when all openings of a horizontal slide door are guarded or screened from bottom of the door to a minimum of 4 ft 1 22 m above the ground to prevent a 2 in 57 2 mm diameter sphere from passing through the openings anywhere in the door For technical support please call 1 800 361 2260 or visit www manaras com for more information 1 Attach track...

Page 7: ...nt idler 4 5 Install chain B Wrap chain around front idler C Wrap chain around operator sprocket D Attach chain to back of carriage A Attach chain to front of carriage Carriage Chain link Chain Front idler Chain Chain Operator sprocket Carriage Chain link Chain Nut E Adjust the tension on the chain Plastic sleeve Install the plastic sleeves over the standard spacers provided ...

Page 8: ...lish the center of the door 2 Establish the highest point of door travel 3 Position the U shaped wall bracket Center of the door Highest point of door travel Anti vibration bracket Attach the anti vibration bracket to the U shaped wall bracket using the nuts supplied with the bracket Secure anti vibration bracket to the header using the appropriate anchors for your type of wall Wall fixation hole ...

Page 9: ...osition and hang the Silencio operator Track Tracks front end Using the operator s rear bracket and appropriate fasteners secure the operator to the hanging brackets Hanging brackets example Hoist the rear of the operator to the horizontal position Temporarily secure with rope or chain Tighten wall bracket bolts and nuts Door Side 90 90 5 6 Rear bracket Attach door arm to door using appropriate fa...

Page 10: ...10 Notes For technical support please call 1 800 361 2260 or visit www manaras com for more information ...

Page 11: ... written specifications are not properly applied by the Buyer when selecting the equipment If our written instructions for installation and wiring of the electrical connections have not been followed If our equipment has been used to perform functions other than the functions it was designed to handle If Manaras Opera equipment is used with electrical accessories switches relays etc that have not ...

Page 12: ... PARTS DEVANCO CANADA 19192 HAY ROAD UNIT Q SUMMERSTOWN ON K0C 2E0 TOLL FREE 855 931 3334 www devancocanada com WHEN ORDERING REPAIR PARTS PLEASE SUPPLY THE FOLLOWING INFORMATION 3 PART NUMBER 3 DESCRIPTION 3 MODEL NUMBER ...

Reviews: