24
SS-M05_Marine | 1.01.00
www.mc-techgroup.com
Figure 7
Terminals X1, X2, X3
13
STARTING
Observe the plant-specific and process-specific safety measures before commissioning.
Note
Before connecting the mains voltage, the circuit breakers must be set to OFF.
The following steps must be carried out before initial commissioning:
1. Wiring the system cable before commissioning according to the circuit diagram
2. Connect heated line (optional);
Warning
When operating the sample gas conditioning system with a heated
sample gas line, the temperature must be checked at the temperature
controller.
3. Connect power to the system cables
4. Switch circuit breaker 1 to position ON.
5. Switch circuit breaker 2 to position ON with optional sample gas line.
Carry out the following steps for commissioning:
1. Switch on the fuses/circuit-breakers of the gas treatment device
a. F2 heated sample tube. (self regulating)
b. F1 Gas cooler, sample gas pump, bellow valve pump, etc.
2. the gas conditioning unit is ready for operation after 45 minutes
3. Switch on –Q1 sample gas pump.
4. Set the sample gas flow at the regulating valve on the head of the sample gas pump to approx.
70 Nl/h.
Summary of Contents for 03G6000
Page 44: ...44 SS M05_Marine 1 01 00 www mc techgroup com Figure 13 Wiring diagram part 1 ...
Page 45: ...www mc techgroup com SS M05_Marine 1 01 00 45 Figure 14 Wiring diagram part 2 ...
Page 46: ...46 SS M05_Marine 1 01 00 www mc techgroup com ...
Page 47: ...www mc techgroup com SS M05_Marine 1 01 00 47 ...
Page 48: ...48 SS M05_Marine 1 01 00 www mc techgroup com ...