51
TPM 075/09
Fig. 64
Installation frames R1, R2
1
Installation in solid ceiling
construction
Installation in solid wall
construction
1
2
Installation in gypsum wall construction
1
2
Installation opening
perimeter has to be
reinforced by standard
drywall profiles.
Notices:
Installation frame R1 - for solid wall construction with thickness 100 mm
Installation frame R2 - for solid wall construction with thickness 150 mm
Gap between frame and solid (gypsum) wall construction must be filled by glue (PROMAT K84).
6.3.
Damper installation with using installation frames - round dampers
Installation opening a x b:
• a x b = (D+145 mm) x (D+145 mm);
• D = Damper nominal size
+3
+3
POSITION:
1
FDMB-R with installation frame R1 or R2
2
Holder with screws