52
TPM 075/09
Fig. 65
Installation frame R3, R4
1
Installation in solid wall
construction
Notices:
Installation frame R3 - for solid wall construction with thickness 100 mm
Installation frame R4 - for solid wall construction with thickness 150 mm
Gap between frame and solid (gypsum) wall construction must be filled by glue (PROMAT K84).
1
2
1
2
Installation opening
perimeter has to be
reinforced by standard
drywall profiles.
Installation in gypsum wall
construction
Installation opening:
• d = (D+111 mm)
• D = damper nominal size
+3
POSITION:
1
FDMB-R with installation frame R3 or R4
2
Holder with screws
Installation in solid ceiling
construction
Summary of Contents for FDMB
Page 1: ......