Page 79
Version 2023-06-15
Fire damper - FDMR
TPM 140/19
■
For connection of following duct
■
Installation frame can be installed on the damper or delivered separately
■
Installation procedure of the installation frame for FDMR
Ø
D
X
Ø
D+10
+3
(installation opening)
4 x
Ø
12
EIS 90
* min. 110 mm - Concrete
min. 125 mm - Aerated concrete
≥
1
1
0
*
1
1
0
Ø
D
In solid ceiling construction - installation frame R5
X =
Ø
D+120
for dampers
Ø
D 100-200 mm
X =
Ø
D+167
for dampers
Ø
D 225-800 mm
1
FDMR
2
Installation frame - apply HILTI CFS-S ACR mastic at the entire area and
glue it to the fire separating construction
3
Fill the gaps with glue PROMAT K84
4
Duct
5
Clamp with threaded rod
6
Solid ceiling construction
7
Holes for fixing the frame with threaded rods or steel anchors (frame
fixing material not included)