SEDM - Smoke extraction damper - multi
TPM 156/22
X
≥
100
X
Gypsum wall construction - Ablative Coated Batt - vertical blade axis position
* Cover of actuating mechanism has to be removable after installation
1
SEDM
2
Gypsum wall construction
3
Ablative Coated Batt (e.g. Firestop Board HILTI CFS-CT B 1S 140/50 - min. density
140 kg/m
3
+ Firestop acrylic sealant HILTI CFS-S ACR or equivalent)
4
Fire stop coating thickness 1 mm (e.g. HILTI CFS-CT, PROMASTOP-CC or equivalent)
5
Fixing profile with threaded rod
6
Calcium silicate Actuator housing*
■
For connection following duct
■
Examples of anchors to the fire dividing construction
EIS 120
X
≥
100
X
Gypsum wall construction - Ablative Coated Batt - horizontal blade axis position
* Cover of actuating mechanism has to be removable after installation
1
SEDM
2
Gypsum wall construction
3
Ablative Coated Batt (e.g. Firestop Board HILTI CFS-CT B 1S 140/50 - min. density
140 kg/m
3
+ Firestop acrylic sealant HILTI CFS-S ACR or equivalent)
4
Fire stop coating thickness 1 mm (e.g. HILTI CFS-CT, PROMASTOP-CC or equivalent)
5
Fixing profile with threaded rod
6
Calcium silicate Actuator housing*
■
For connection following duct
■
Examples of anchors to the fire dividing construction
EIS 120
Installation in gypsum wall construction of fire compartment