![background image](http://html1.mh-extra.com/html/mandik/sedm/sedm_technical-documentation-manual_4070801041.webp)
Page 41
Version 2022-12-20
SEDM - Smoke extraction damper - multi
TPM 156/22
1
Gypsum wall construction
2
SEDM
3
Ablative Coated Batt
4
Fixing element/steel holder for connecting damper to the wall (optional accessories
MANDIK, a.s. or sheet metal min. thickness 2 mm and min. width 60 mm)
5
Screw UNI 6x60 mm
6
Installation hols
7
M8 bolt assemply (bolt M8x55 mm, 2 pcs large washer M8, nut M8) *
8
Gypsum grid from "C" profile
*
ATTENTION TO THE LOCATION OF THE JOINT !
Screws and nuts must not impede the free rotation of Blades.
■
The method of mounting must meet the
minimum requirements for attachment
in accordance with national regulations.
Fixing SEDM to the gypsum wall construction with Ablative Coated Batt system
A
A